Bethel Fuels Project Performance
Period RSE Services
|
![]() |
|
RSE
conducted an environmental engineering analysis to satisfy agency concerns
for use of permafrost under a 10 million gallon bulk fuel facility in
as a component of a lined containment installation. RSE services included
installation of Internet accessed soil moisture and temperature probes
via dataloggers permitting direct agency access to site data as part
of the permit process. |
|
|
|
|
|
Kenai River Center Performance Period RSE Services
|
![]() |
| RSE is
participating in a groundwater/surface water interaction study along the
lower Kenai River to identify groundwater contributions to the Kenai River
and importance to salmon spawning habitat. This study results will be
used to assist resource managers in understanding factors that may influence
viability of habitat for salmon spawning. |
|
|
|
|
|
Pitkas Point Restoration Project Client: Performance Period RSE Services
|
![]() |
| RSE provided site assessment and remediation services along with a preliminary watershed vulnerability assessment for diesel-impacts to the village water supply. RSE supported the engineering design of an interim water collection system and regulatory reporting of corrective action activities. | |
|
|
|
|
Fisher Hangar Phase I, II, and III ESA Client: Performance Period RSE Services
|
![]() |
| RSE completed an extensive Phase I,II,III ESA for refined petroleum contamination at the former Yute Air lease site at the Bethel Airport. Project included excavation and proposed treatment of over 1,200 cubic yards of contaminated soil at a restricted access site with a weather-limited construction window. | |