Representative Project Profiles


Our website is currently undergoing reconstruction and updates! Listed below are a few past RSE projects. Please check back again for an updated version of RSE Projects. 



Bethel Fuels Project

Performance Period
1997 to 2000

RSE Services

  • Containment Engineering
  • Cold Regions Engineering
  • Fate and Transport Modeling

RSE conducted an environmental engineering analysis to satisfy agency concerns for use of permafrost under a 10 million gallon bulk fuel facility in as a component of a lined containment installation. RSE services included installation of Internet accessed soil moisture and temperature probes via dataloggers permitting direct agency access to site data as part of the permit process.


Kenai River Center

Performance Period
1999 to 2003 (estimated)

RSE Services

  • Groundwater/Surface Water Assessment
  • Well Installation, sensor installation, data collection.
RSE is participating in a groundwater/surface water interaction study along the lower Kenai River to identify groundwater contributions to the Kenai River and importance to salmon spawning habitat. This study results will be used to assist resource managers in understanding factors that may influence viability of habitat for salmon spawning.

Pitkas Point Restoration Project

Client:
Lower Yukon School District

Performance Period
2000-2001

RSE Services

  • Geotechnical Engineering
  • Containment Engineering
  • Site Characterization
  • Water System and Infiltration Galley PS&E Upgrade
RSE provided site assessment and remediation services along with a preliminary watershed vulnerability assessment for diesel-impacts to the village water supply. RSE supported the engineering design of an interim water collection system and regulatory reporting of corrective action activities.

Fisher Hangar Phase I, II, and III ESA

Client:
Bankruptcy Trustee

Performance Period
1997 to 2001

RSE Services

  • Geotechnical Engineering
  • Groundwater/Surface Water Assessment
  • Site Characterization and remediation program, including ADEC approval via Internet Project Management Access.
RSE completed an extensive Phase I,II,III ESA for refined petroleum contamination at the former Yute Air lease site at the Bethel Airport. Project included excavation and proposed treatment of over 1,200 cubic yards of contaminated soil at a restricted access site with a weather-limited construction window.

Send questions or comments to: admin@restorsci.com

Copyright © 2000 Engineering and Environmental Internet Solutions, LLC, (website development).
Copyright © 1998-2000 Restoration Science and Engineering (documents & photos).
All rights reserved.
URL: http://www.restorsci.com